Water Distribution System
 

Water Distribution System is between drift eliminator and tower fill in the tower.  It provides  distribution of hot water, coming from facility homogenously on fills inside of tower. If the water temperature is lower than 55 ˚C, the material of main pipe and by-pass is PVC; if it is higher, they are produced from Polypropylene or FRP (Fiberglass Reinforced Polyester).


Main Pipe and bypass are produced   with flashed connection so that they can be  easily fixed and pulled apart. It is produced without needing cut/paste operations while maintenance period.

 

 

 PVC  Water Distribution System
PVC Cervical and PVC spiral flange 

 

 

 

Water Distribution System in Use

 

     
   
    << back
   
 
 
 

ENSOTEK CTP Su Soğutma Kuleleri ve Teknolojileri Mühendislik San.Tic. Ltd. Şti

Muratpaşa Mah. Uluyol Cad. No:19 İstanbul Tower K:5 Bayrampaşa İSTANBUL - TÜRKİYE
Tel: +90212 613 33 09 - 01 (Pbx) - Fax: +90212 613 33 10

Ensotek Cooling Towers Copyright © 2006 - 2014

Web Tasarım MW